• DocumentCode
    1961402
  • Title

    High power test of a SLED system with dual side-wall coupling irises for linear colliders

  • Author

    Matsumoto, Hiroshi ; Baba, Hiroshi ; Miura, Atsushi ; Yamaguchi, Seiya

  • Author_Institution
    KEK, Nat. Lab. for High Energy Phys., Ibaraki, Japan
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    959
  • Abstract
    A new SLED cavity has been developed for the 1.54 GeV injector linac of the KEK Accelerator Test Facility (ATF). A significant reduction of electric fields near the irises has been achieved by adopting dual side-wall coupling irises. The new SLED cavities were successfully operated at an output rf-power of 380 MW after the total operation time of 500 hours without any serious breakdown problems
  • Keywords
    beam handling equipment; cavity resonators; electron accelerators; linear accelerators; 1.54 GeV; 380 MW; ATF; KEK Accelerator Test Facility; SLED system; dual side-wall coupling irises; injector linac; linear colliders; Equations; Fabrication; Filling; Iris; Klystrons; Space vector pulse width modulation; Stability; Surface waves; System testing; Waveguide discontinuities;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.308716
  • Filename
    308716