DocumentCode :
1962188
Title :
RF commissioning of the Superconducting Super Collider radio frequency quadrupole accelerator
Author :
Cutler, R.I. ; Arbique, G. ; Grippe, J. ; Marsden, S. ; Marrufo, O. ; Rodriguez, Roberto
Author_Institution :
SSC Lab., Dallas, TX, USA
fYear :
1993
fDate :
17-20 May 1993
Firstpage :
827
Abstract :
The SSC 2.5-MeV H- RFQ is powered by a 600-kW, 428-MHz pulsed RF amplifier system. The results of the SSC RFQ RF commissioning, including the measurements of cavity field stability (phase and amplitude) are presented
Keywords :
beam handling equipment; nuclear electronics; particle beam diagnostics; proton accelerators; radiofrequency amplifiers; storage rings; synchrotrons; 2.5 MeV; 428 MHz; 600 kW; H; H- RFQ; RF commissioning; SSC; Superconducting Super Collider; amplitude stability; cavity field stability measurement; phase stability; pulsed RF amplifier; radiofrequency quadrupole accelerator; Acceleration; Electrons; Particle beams; Phase measurement; Pulse amplifiers; Radio frequency; Radiofrequency amplifiers; Resonance; Stability; Temperature;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
Type :
conf
DOI :
10.1109/PAC.1993.308759
Filename :
308759
Link To Document :
بازگشت