DocumentCode :
1962474
Title :
Accelerated reliability growth in a cogeneration plant with a fluidized bed boiler
Author :
Shor, S.W.W. ; Wietzke, Donald L.
Author_Institution :
Bechtel Power Corp., San Francisco, CA, USA
fYear :
1989
fDate :
1-5 Oct. 1989
Firstpage :
1779
Abstract :
The authors describe an accelerated technology for circulating fluidized bed combustion. The approach used included a reliability analysis, early system start-up tests, and systematic exploitation of operating experience with similar units that started up earlier. Exploiting experience with earlier units turned out to be the most important of the three actions. Many potential problems were eliminated and the plant passed its reliability acceptance test on the first attempt.<>
Keywords :
boilers; cogeneration; fluidised beds; reliability; cogeneration plant; fluidized bed boiler; fluidized bed combustion; reliability; reliability acceptance test; Acceleration; Availability; Boilers; Cogeneration; Combustion; Delay; Fluidization; Power generation; Power system reliability; System testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industry Applications Society Annual Meeting, 1989., Conference Record of the 1989 IEEE
Conference_Location :
San Diego, CA, USA
Type :
conf
DOI :
10.1109/IAS.1989.96881
Filename :
96881
Link To Document :
بازگشت