DocumentCode :
1967833
Title :
Amending schedule-cost coefficient correlation based on historical statistics
Author :
Yan-Qiong, Liu ; Ying-Wu, Chen ; Feng, Gao
Author_Institution :
Inf. Syst. & Manage. Sch., Nat. Univ. of Defense Technol., HuNan, China
fYear :
2005
fDate :
15-17 Aug. 2005
Firstpage :
300
Lastpage :
305
Abstract :
The schedule-cost correlation coefficient is usually estimated by experts in the spaceflight project management practice. This paper deduced the schedule distribution model considering the effect of the cost uncertainty. And then theoretically analyzed and demonstrated how to amend the schedule-cost correlation coefficient according to the historical statistics based on the conditional probability distribution functions between the schedule and the cost. A general rule was put forward to ascertain the value of the schedule-cost correlation coefficient. This method was proved in analytical method. This work can correct the traditional subjective estimation method just according to the experts´ experiences and expertise.
Keywords :
correlation methods; costing; space vehicles; statistical distributions; historical statistics; probability distribution function; schedule distribution model; schedule-cost coefficient correlation; spaceflight project management; subjective estimation method; Cost function; Gaussian distribution; Information management; Management information systems; Probability density function; Probability distribution; Project management; Statistical distributions; Statistics; Uncertainty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Reuse and Integration, Conf, 2005. IRI -2005 IEEE International Conference on.
Print_ISBN :
0-7803-9093-8
Type :
conf
DOI :
10.1109/IRI-05.2005.1506490
Filename :
1506490
Link To Document :
بازگشت