    Commissioning status of the Continuous Wave Deuterium Demonstrator

  • Author

    Hartog, P. Den ; Dooling, J. ; Lorello, M. ; Rathke, J. ; Carwardine, J. ; Godden, D. ; Pile, G. ; Yule, T. ; Zinneman, T.

  • Author_Institution
    Grumman Corp., Bethpage, NY, USA
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    1709
  • Abstract
    Grumman Aerospace Corporation, Argonne National Laboratory, and Culham Laboratory are commissioning the Continuous Wave Deuterium Demonstrator (CWDD) in a facility at Argonne National Laboratory. CWDD is a high-brightness, high-current, 7.5-MeV negative deuterium accelerator. The 352-MHz rf accelerating cavities ate cryogenically cooled with supercritical neon to reduce the rf power requirements. Installation of the accelerator into the Argonne facility began in May 1991, and first beam from the injector was extracted in February 1992. The accelerator and facility are described, and current status and future plans are discussed
  • Keywords
    cavity resonators; ion accelerators; linear accelerators; 352 MHz; 7.5 MeV; CWDD; Continuous Wave Deuterium Demonstrator; D; commissioning; rf accelerating cavities; Acceleration; Assembly; Brightness; Cooling; Deuterium; Electrons; Laboratories; Particle beams; Physics; Space technology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.309106
  • Filename
    309106