Title :
Short term hydropower dispatching optimization of cascaded hydropower stations based on two-stage optimization
Author_Institution :
Sch. of Civil Eng., Tianjin Univ., Tianjin, China
Abstract :
A two-stage optimization strategy and its models for short-term hydropower dispatching optimization is developed to solve unit commitment and load distribution problem with unit commitment optimization sub-model and min water consumption sub-model. Moreover, improved ant algorithm with new selection mechanism and iteration mechanism are introduced for optimization. The proposed methods are employed to solve short-term hydropower dispatching optimization of Longyangxia-Lijiaxia cascaded hydropower stations in Yellow river. Operation characteristics of units and their combined operation strategies are developed by the field test. The results show that the proposed methods are able to obtain dispatching solution with lower water consumption rate and better load distribution and feasible unit commitment.
Keywords :
hydroelectric power; hydroelectric power stations; iterative methods; load distribution; optimisation; power generation dispatch; power generation scheduling; Longyangxia-Lijiaxia cascaded hydropower stations; Yellow river; ant algorithm; hydropower dispatching optimization; iteration mechanism; load distribution problem; min water consumption sub-model; selection mechanism; two stage optimization strategy; unit commitment optimization sub-model; water consumption rate; cascaded hydropower stations; field test; improved ant algorithm; short-term hydropower dispatching; two-stage optimization; unit commitment;
Conference_Titel :
Industrial and Information Systems (IIS), 2010 2nd International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-7860-6
DOI :
10.1109/INDUSIS.2010.5565870