DocumentCode
1970194
Title
The continuous and seamless replacement of a running control system succeeded
Author
Egan-Krieger, G.V. ; Muller, R. ; Rahn, J.
Author_Institution
BESSY, Berlin, Germany
fYear
1993
fDate
17-20 May 1993
Firstpage
1887
Abstract
A continuous replacement and upgrade procedure for the control system of the running light source BESSY has been proposed in 1990 [3]. Today we can present the components of the `final´ system. The concept has shown to be practicable and flexible. Technically improved solutions unforeseeable at start time of the conversion and not available before 1991 could be utilized even in the main turnover phase. The intended goals have been achieved: Beam time has not been affected by the conversion process. Developmental and operational experiences show that the system will supply us with key components for the control of BESSY II
Keywords
distributed processing; electron accelerators; physical instrumentation control; storage rings; BESSY; distributed computing environment; electronically cascading interface system; running control system; running light source; synchrotron light; Aging; Control systems; Displays; Ethernet networks; Graphical user interfaces; Hardware; Modems; Protocols; Software architecture; Workstations;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location
Washington, DC
Print_ISBN
0-7803-1203-1
Type
conf
DOI
10.1109/PAC.1993.309165
Filename
309165
Link To Document