Title :
Status of TRISTAN-II project
Author :
Kurokawa, Shin-ichi
Author_Institution :
Nat. Lab. for High Energy Phys., Ibaraki, Japan
Abstract :
TRISTAN-II (B-Factory) project at KEK aims at constructing an accelerator complex which enables us to detect the CP-violation effect in B-mesons. It is a 3.5×8 GeV electron-positron collider in the existing TRISTAN tunnel. The eventual luminosity goal is 1034 cm-2s-1. Progress of design work and present status of R&D are reported
Keywords :
electron accelerators; storage rings; B-Factory project; B-mesons; CP-violation effect; KEK; TRISTAN-II project status; electron-positron collider; luminosity; Cutoff frequency; Detectors; Electrons; Laboratories; Linear particle accelerator; Magnets; Positrons; Radio frequency; Research and development; Venus;
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
DOI :
10.1109/PAC.1993.309203