Title :
Physics requirements of commissioning diagnostics for SSCL linac
Author :
Hurd, J.W. ; Arbique, G.M. ; Crist, C.E. ; Guy, F.W. ; Haworth, M. ; Leifeste, G.T. ; Saadatmand, K. ; Krogh, M. ; Mcginnis, K. ; Stittsworth, D. ; Vandeusen, A. ; Wright, S.
Author_Institution :
Superconducting Super Collider Lab., Dallas, TX, USA
Abstract :
Commissioning diagnostics are described in terms of the beam physics requirements of the SSCL linac. Commissioning diagnostics include current monitors, beam position monitors, spectrometer, foil scattering experiment, wire scanners, Faraday cups, and bunch shape monitors. Two DOE integrated contractors, the Superconducting Super Collider Laboratory and Allied Signal, Kansas City Plant, are developing the commissioning diagnostics. The need to measure bright, short linac beam pulses requires special design considerations. High density harps and collectors with up to 50 wires per cm and 128 wires total, and fast, 3.5-MHz amplifiers have been developed. The diagnostics will be first used and tested during beam commissioning of the RFQ
Keywords :
ion accelerators; linear accelerators; particle beam diagnostics; 3.5 MHz; Faraday cups; SSC linac; amplifiers; beam position monitors; collectors; commissioning diagnostics; current monitors; foil scattering experiment; harps; spectrometer; wire scanners; Laboratories; Linear particle accelerator; Physics; Pulse amplifiers; Pulse measurements; Scattering; Shape; Spectroscopy; Superconducting filaments and wires; US Department of Energy;
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
DOI :
10.1109/PAC.1993.309242