DocumentCode :
1973519
Title :
Optimization of economizer tubing system renewal decisions
Author :
Sun, Yong ; Ma, Lin ; Fidge, Colin
Author_Institution :
Sch. of Eng. Syst., Queensland Univ. of Technol., Brisbane, QLD, Australia
fYear :
2008
fDate :
10-12 Nov. 2008
Firstpage :
1
Lastpage :
6
Abstract :
The economizer is a critical component in coal fired power stations. An optimal renewal strategy is needed for minimizing the lifetime cost of this component. Here we present an effective optimization approach which considers economizer tubing failure probabilities, repair and renewal costs, potential production losses, and fluctuations in electricity market prices.
Keywords :
boilers; costing; optimisation; power generation faults; power markets; thermal power stations; coal fired power stations; economizer tubing failure probability; economizer tubing system renewal decisions; electricity market prices; lifetime cost; potential production losses; renewal cost; repair cost; Boilers; Cost function; Equations; Frequency; Gases; Measurement errors; Power generation; Power system modeling; Shape measurement; Software maintenance;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA), 2008 First International Conference on
Conference_Location :
Rotterdam
Print_ISBN :
978-1-4244-6887-4
Type :
conf
DOI :
10.1109/INFRA.2008.5439663
Filename :
5439663
Link To Document :
بازگشت