DocumentCode :
1974232
Title :
An improved differential evolution for permutation flowshop scheduling problem with total flowtime criterion
Author :
Liu, Wenbo
Author_Institution :
Logistics Dept., Liaoning Provincial Coll. of Commun., Shenyang, China
Volume :
1
fYear :
2012
fDate :
20-21 Oct. 2012
Firstpage :
324
Lastpage :
327
Abstract :
This paper proposes an improved differential evolution (DE) for the permutation flowshop scheduling problem with the total flowtime minimization, an NP-complete problem. To enhance the exploration ability of DE, a hybrid method of simulated annealing and stochastic variable neighborhood search are incorporated. To improve the search diversification of DE, a population restart method based path relinking is applied to replace non-promising solutions. Experimental results on benchmark instances show that the proposed DE algorithm is competitive to other metaheuristics proposed for the PFSP with total flowtime minimization in the literature.
Keywords :
computational complexity; evolutionary computation; flow shop scheduling; search problems; simulated annealing; DE; NP-complete problem; differential evolution; flowtime minimization; nonpromising solutions; permutation flowshop scheduling problem; population restart method based path relinking; search diversification; simulated annealing; stochastic variable neighborhood search; total flowtime criterion; Benchmark testing; Europe; Job shop scheduling; Minimization; Simulated annealing; Sociology; Statistics; differential evolution; permutation flowshop scheduling; total flowtime;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
System Science, Engineering Design and Manufacturing Informatization (ICSEM), 2012 3rd International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4673-0914-1
Type :
conf
DOI :
10.1109/ICSSEM.2012.6340739
Filename :
6340739
Link To Document :
بازگشت