DocumentCode :
1975206
Title :
EHV line sleet melting
Author :
Corbett, F.M.
Author_Institution :
LM IEEE, Montreal, Que., Canada
Volume :
1
fYear :
2003
fDate :
4-7 May 2003
Firstpage :
655
Abstract :
Techniques which had been employed for melting ice from medium - voltage power transmission lines have been deemed inapplicable to the bundled conductor lines of extra-high-voltage (EHV) systems. Other strategic approaches are being devised and applied instead. The present paper is an exploration of an alternative conductor - loading method which, if successful, should permit EHV lines to ride through ice storms without interruption of service.
Keywords :
conductors (electric); ice; power transmission lines; EHV line sleet melting; bundled conductor lines; conductor loading method; extra-high-voltage system; ice storms; melting ice; voltage power transmission lines; Conductors; Costs; Electrochemical machining; Ice; Medium voltage; Poles and towers; Power transmission lines; Storms; Switches; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical and Computer Engineering, 2003. IEEE CCECE 2003. Canadian Conference on
ISSN :
0840-7789
Print_ISBN :
0-7803-7781-8
Type :
conf
DOI :
10.1109/CCECE.2003.1226480
Filename :
1226480
Link To Document :
بازگشت