DocumentCode
1979745
Title
Impedance budget and beam stability analysis of the Fermilab Main Injector
Author
Martens, M.A. ; Ng, K.Y.
Author_Institution
Fermi Nat. Accel. Lab., Batavia, IL, USA
fYear
1993
fDate
17-20 May 1993
Firstpage
3300
Abstract
The impedance budget of the Fermilab Main Injector (MI) is estimated, which includes the contributions from the resistive walls, bellows, RF cavities, steps, Lambertsons, etc. Beam stability during ramping and bunch coalescence is analyzed. The transverse resistive-wall coupled bunch growth is found to be somewhat worse than the situation in the Main Ring (MR)
Keywords
beam handling techniques; particle beam diagnostics; proton accelerators; synchrotrons; Fermilab Main Injector; Lambertsons; MI; Main Ring; RF cavities; beam stability analysis; bellows; bunch coalescence; impedance budget; ramping; resistive walls; steps; transverse resistive-wall coupled bunch growth; Acceleration; Bellows; Frequency estimation; Impedance measurement; Laboratories; Optical coupling; Protons; Shape; Stability analysis; Steel;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location
Washington, DC
Print_ISBN
0-7803-1203-1
Type
conf
DOI
10.1109/PAC.1993.309632
Filename
309632
Link To Document