DocumentCode :
1980153
Title :
Required cavity HOM deQing calculated from probability estimates of coupled bunch instabilities in the APS ring
Author :
Emery, L.
Author_Institution :
Argonne Nat. Lab., IL, USA
fYear :
1993
fDate :
17-20 May 1993
Firstpage :
3360
Abstract :
A method of determining the deQing requirement of individual cavity higher-order modes (HOM) for a multi-cavity RF system is presented and applied to the APS ring. Since HOM resonator frequency values are to some degree uncertain, the HOM frequencies should be regarded as random variables in predicting the stability of the coupled bunch beam modes. A Monte Carlo simulation provides a histogram of the growth rates from which one obtains an estimate of the probability of instability. The damping of each HOM type is determined such that the damping effort is economized, i.e. no single HOM dominates the specified growth rate histogram
Keywords :
beam handling equipment; cavity resonators; electron accelerators; particle beam diagnostics; probability; storage rings; APS ring; Monte Carlo simulation; cavity higher-order modes; coupled bunch beam modes; damping; deQing requirement; growth rates; instability; multi-cavity RF system; resonator frequency values; Damping; Histograms; Impedance; Laboratories; Optical coupling; Probability; Radio frequency; Random variables; Resonant frequency; Stability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
Type :
conf
DOI :
10.1109/PAC.1993.309652
Filename :
309652
Link To Document :
بازگشت