EHV transmission lines wires location on line operation issues - case studies
Author :
Klucznik, Jacek ; Lubosny, Zbigniew ; Dobrzynski, Krzysztof ; Czapp, Stanislaw
Author_Institution :
Faculty of Electrical and Control Engineering, Gdansk University of Technology, Poland
fYear :
2015
fDate :
June 29 2015-July 2 2015
Firstpage :
1
Lastpage :
6
Abstract :
Transmission lines towers construction affects the line parameters and influences on its operation in the future. Misguided design of the tower can lead to serious problems such as overvoltages, electric arc extinction difficulties, voltage asymmetry, resonance phenomena or increasing of magnetic field near the line. The paper points out those threats on example of 400 kV double circuit overhead transmission line with shunt reactors. The paper discuses the impact of circuits orientation of the transmission line, phase wires arrangement and line transpositions on above problems. The study includes steady state analyses and transient analyses (EMT simulations).
Keywords :
Earth; Inductors; Integrated circuit modeling; Magnetic fields; Poles and towers; Power transmission lines; Wires; Electromagnetic transients; Mutual Coupling; Resonance; Transmission Lines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PowerTech, 2015 IEEE Eindhoven
Conference_Location :
Eindhoven, Netherlands
Type :
conf
DOI :
10.1109/PTC.2015.7232305
Filename :
7232305
Link To Document :
بازگشت