DocumentCode :
1982697
Title :
Synchronous phase changes due to the gap in the bunch train [particle beam]
Author :
Greenwald, Z. ; Tigner, M.
Author_Institution :
Lab. of Nucl. Studies, Cornell Univ., Ithaca, NY, USA
fYear :
1993
fDate :
17-20 May 1993
Firstpage :
3690
Abstract :
The B Factory bunch train in both beams is designed with a 250 nsec gap in order to minimize ion trapping. Possible differences in the synchronous phase between the bunches due to this gap in the bunch train are studied. Such an unequal phase shift between the bunches could lower the luminosity
Keywords :
beam handling techniques; electron accelerators; storage rings; 250 ns; B Factory; bunch train; ion trapping; luminosity; phase shift; synchronous phase; Energy loss; Laboratories; Niobium; Particle beams; Production facilities; Radio frequency; Resonance; Resonant frequency; Steady-state; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
Type :
conf
DOI :
10.1109/PAC.1993.309760
Filename :
309760
Link To Document :
بازگشت