• DocumentCode
    1983170
  • Title

    Results from commissioning the AGS Booster orbit system

  • Author

    Bleser, E.

  • Author_Institution
    AGS Dept., Brookhaven Nat. Lab., Upton, NY, USA
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    3766
  • Abstract
    This note reports results from the commissioning of three systems in the AGS Booster: the beam position monitor system, which works to a relative accuracy of 0.36 millimeters; the uncorrected Booster orbit, which has quite large excursions; and the passive eddy current correction system, which eliminates all but a few percent of the eddy current dipole effect
  • Keywords
    beam handling techniques; proton accelerators; synchrotrons; tuning; AGS Booster orbit system; beam position monitor system; commissioning; eddy current dipole effect; passive eddy current correction system; uncorrected Booster orbit; Current measurement; Eddy currents; Extraterrestrial measurements; Fitting; Gaussian processes; Laboratories; Magnetic fields; Monitoring; Particle beams; Position measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.309782
  • Filename
    309782