Abstract
The penetration of dispersed generation (DG) sources in the grids is constantly increasing, as a result of both technological advancements and institutional changes in the electric power industry. The connection of new installations is often hindered by a variety of factors, including technical considerations and requirements, usually resolved at the expense of the investor. As the interest for installing new generation facilities escalates, the adoption of transparent and easily applicable technical evaluation procedures becomes imperative. In this paper, the methodology and limits adopted in the connection guide of the Greek utility are outlined. Issues addressed are the steady state and fast voltage variations, as well as flicker and harmonic emissions. Simplified evaluation procedures are proposed, largely based on the relevant IEC publications, which are suitable for practical situations.
Keywords
distribution networks; electric power generation; power supply quality; power system harmonics; Greek utility; IEC publications; dispersed generation grid connection; distribution network; electric power industry; fast voltage variations; flicker; harmonic emissions; institutional changes; power quality; steady state voltage variations; technical evaluation procedures; technical requirements; Distributed power generation; Hydroelectric power generation; IEC standards; Mesh generation; Power generation; Power quality; Safety; Steady-state; Voltage fluctuations; Wind energy generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society Summer Meeting, 2001
Conference_Location
Vancouver, BC, Canada
Print_ISBN
0-7803-7173-9
Type
conf
DOI
10.1109/PESS.2001.970141
Filename
970141
Link To Document