• DocumentCode
    1987816
  • Title

    The effect of time-delayed measurements on a PMU-based state estimator

  • Author

    Asprou, Markos ; Kyriakides, Elias

  • Author_Institution
    Department of Electrical and Computer Engineering, KIOS Research Center for Intelligent Systems and Networks, University of Cyprus, Nicosia, Cyprus
  • fYear
    2015
  • fDate
    June 29 2015-July 2 2015
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The complete integration of the Synchronized Measurement Technology (SMT) in the power systems will bring about fundamental changes to the applications of the control center. One of the natural applications of the SMT is the state estimation. Although the state estimator is used for monitoring the steady state operating condition, it is envisioned that in the near future, a PMU-based state estimator will be able to monitor the dynamic behavior of the power system states. In such an application, the transfer delay of the PMU measurements should not be ignored. In this work, the effect of the PMU measurements transfer delay on the accuracy of a PMU-based state estimator is examined. Further, the optimal waiting time of the Phasor Data Concentrators (for sending information to the control center), and the time execution of a PMU-based state estimator for capturing accurately the state transients during fault conditions are also examined.
  • Keywords
    Area measurement; Generators; Measurement uncertainty; Monitoring; Phase measurement; Synchronization; Wide area networks; Phasor data concentrator; measurement transfer delay; phasor measurement unit; state estimation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PowerTech, 2015 IEEE Eindhoven
  • Conference_Location
    Eindhoven, Netherlands
  • Type

    conf

  • DOI
    10.1109/PTC.2015.7232545
  • Filename
    7232545