DocumentCode
1987816
Title
The effect of time-delayed measurements on a PMU-based state estimator
Author
Asprou, Markos ; Kyriakides, Elias
Author_Institution
Department of Electrical and Computer Engineering, KIOS Research Center for Intelligent Systems and Networks, University of Cyprus, Nicosia, Cyprus
fYear
2015
fDate
June 29 2015-July 2 2015
Firstpage
1
Lastpage
6
Abstract
The complete integration of the Synchronized Measurement Technology (SMT) in the power systems will bring about fundamental changes to the applications of the control center. One of the natural applications of the SMT is the state estimation. Although the state estimator is used for monitoring the steady state operating condition, it is envisioned that in the near future, a PMU-based state estimator will be able to monitor the dynamic behavior of the power system states. In such an application, the transfer delay of the PMU measurements should not be ignored. In this work, the effect of the PMU measurements transfer delay on the accuracy of a PMU-based state estimator is examined. Further, the optimal waiting time of the Phasor Data Concentrators (for sending information to the control center), and the time execution of a PMU-based state estimator for capturing accurately the state transients during fault conditions are also examined.
Keywords
Area measurement; Generators; Measurement uncertainty; Monitoring; Phase measurement; Synchronization; Wide area networks; Phasor data concentrator; measurement transfer delay; phasor measurement unit; state estimation;
fLanguage
English
Publisher
ieee
Conference_Titel
PowerTech, 2015 IEEE Eindhoven
Conference_Location
Eindhoven, Netherlands
Type
conf
DOI
10.1109/PTC.2015.7232545
Filename
7232545
Link To Document