DocumentCode :
1990526
Title :
Comparison of time coordination feasibility criteria for a subtransmission system protection scheme
Author :
Perez, Luis G. ; Urdaneta, Alberto J. ; Sorrentino, Elmer ; Garayar, Felipe ; Urizar, Ales ; Ledezma, Juan C. ; De Alcala, Gladys ; Carrion, Nelson ; Canache, Carlos ; Fernandez, Jose ; Sanz, Oldberg ; Guevara, Freddy
Author_Institution :
Simon Bolivar Univ., Caracas, Venezuela
fYear :
1998
fDate :
2-4 Mar 1998
Firstpage :
314
Lastpage :
319
Abstract :
This paper presents the evaluation of a line protection scheme for interconnected power subtransmission systems by comparison of the feasibility of relay time coordination, under different criteria. The protection scheme consists of distance relays as primary protection and directional overcurrent relays as back-up relays at 69 kV. A coordination computer program that uses linear programming and goal programming techniques is employed to determine the relay settings. Three cases are considered: (1) independent coordination of inverse-time relays and distance relays; (2) combined coordination of inverse-time directional overcurrent relays considering distance relays; and (3) combined coordination of definite-time-high-current setting directional overcurrent relays. The test case consists of a system located in the Eastern zone of Venezuela with 108 buses, 86 lines, 61 transformers and 97 directional overcurrent relays. It is shown that all three cases have advantages and disadvantages regarding the feasibility and viability of relay coordination, however the case with definite-time-high-current setting directional overcurrent relays is simpler for time coordination achievement
Keywords :
linear programming; overcurrent protection; power engineering computing; power system interconnection; power transmission protection; relay protection; 69 kV; coordination computer program; directional overcurrent relays; distance relays; goal programming techniques; interconnected power subtransmission systems; line protection scheme; linear programming; relay settings; relay time coordination; subtransmission system protection scheme; time coordination feasibility criteria; Digital relays; Linear programming; Power system interconnection; Power system protection; Power system relaying; Power system reliability; Protective relaying; Substation protection; System testing; Transformers;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Devices, Circuits and Systems, 1998. Proceedings of the 1998 Second IEEE International Caracas Conference on
Conference_Location :
Isla de Margarita
Print_ISBN :
0-7803-4434-0
Type :
conf
DOI :
10.1109/ICCDCS.1998.705856
Filename :
705856
Link To Document :