Title :
Construction technology of underwater control blasting in hole-pile
Author :
Yang, Xuexiang ; Xiao, Lin
Author_Institution :
Sch. of Urban Constr., Yangtze Univ., Jingzhou, China
Abstract :
If there were hard boulders or rock layers distributed in the formation of pile foundation, it was difficulties to the drilling hole-pile. Blasting before drilling was used in hard rock layer; underwater control millisecond initiation was used in hole-pile; cumulative blasting was used in hard boulders; blasting was used in outshoot stones. Construction efficiency was greatly improved.
Keywords :
foundations; rocks; construction technology; cumulative blasting; hard boulders; hole-pile; pile foundation; rock layers; underwater control blasting; Bridges; Drugs; Electron tubes; Explosives; Road transportation; Rocks; blasting before drilling; construction of hole-pile; underwater blasting; underwater cumulative blasting; underwater millisecond initiation;
Conference_Titel :
Electrical and Control Engineering (ICECE), 2011 International Conference on
Conference_Location :
Yichang
Print_ISBN :
978-1-4244-8162-0
DOI :
10.1109/ICECENG.2011.6058129