Title :
The research of arc-proofness of set tools for 110-220 kV live line works
Abstract :
This paper presents the results of studies on the arc-proofness of insulating booms of aerial platforms for live line works. The data obtained with 5-20 kA power arcs applied for 1.5-0.1 sec, show acceptable arc-proofness of tested insulating boom samples and full-scale models as well as their ability to withstand nominal voltage or even switching overvoltages after such an arc, if autoreclosing occurs during live line work. The obtained results make possible further improvements of existing telescopic platforms
Keywords :
Conductors; Copper; Dielectrics and electrical insulation; Glass; Insulator testing; Power system modeling; Protection; Surges; System testing; Voltage;
Conference_Titel :
Transmission and Distribution Construction and Live Line Maintenance, 1993. Proceedings from ESMO-93., Sixth International Conference on
Conference_Location :
Las Vegas, NV
Print_ISBN :
0-7803-1340-2
DOI :
10.1109/TDCLLM.1993.316234