• DocumentCode
    1998599
  • Title

    Live-working techniques on 220 kV long-span towers

  • Author

    Xi Sheng Sun

  • Author_Institution
    Harbin Electric Power Bureau
  • fYear
    1993
  • fDate
    12-17 Sep 1993
  • Firstpage
    369
  • Lastpage
    384
  • Abstract
    This paper outlines integrated live-working techniques, designed by Harbin Power Bureau, to solve the problem of operating on 220 kV long-span towers. It also describes replacement methods for a whole string of suspension insulators and a whole string of tension insulators on on a live line, an oiling method for the release clips (suspension type) of conductors, an examination method for conductors and their accessories (including damping wire and its release clip, dampers), and a method of eliminating the detected defects on a live line. Also, this paper introduces a new self-made stretchable cable method using buckets and clamps, presents the design basis of such clamps and effective ways of testing clamps easily
  • Keywords
    insulators; maintenance engineering; poles and towers; power overhead lines; power transmission lines; 220 kV; buckets; clamps; design; examination method; insulator string; live-working techniques; long-span towers; maintenance; oiling; overhead power transmission lines; release clips; replacement methods; stretchable cable method; suspension insulators; tension insulators; testing; Automatic testing; Cities and towns; Clamps; Maintenance; Occupational safety; Poles and towers; Power supplies; Rivers; Tellurium; Tiles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Construction and Live Line Maintenance, 1993. Proceedings from ESMO-93., Sixth International Conference on
  • Conference_Location
    Las Vegas, NV
  • Print_ISBN
    0-7803-1340-2
  • Type

    conf

  • DOI
    10.1109/TDCLLM.1993.316235
  • Filename
    316235