DocumentCode
2016007
Title
Main criteria in interconnection of generating units to islanded grids, Salalah IPP2 case study
Author
Zeinali, R. ; Siahkali, H. ; Amelian, M. ; Alriyami, H.A. ; Sinha, A.K. ; Kulkarni, G.
Author_Institution
Syst. & Energy Study Center, Monenco, Iran
fYear
2015
fDate
1-4 Feb. 2015
Firstpage
1
Lastpage
5
Abstract
In each islanded grids, a number of technical rules and recommendations need to be followed in operation ensuring smooth operation of the system and to enable grid disturbances to be controlled. These technical rules and recommendations, however, give the operators the option of going beyond mere compliance with these minimum requirements, implementing more stringent requirements or even defining these in details. In this paper, main criteria and rules, which should be considered in interconnection power plants to the islanded grids, are reviewed. One of the criteria, that is a main concern of system planners and operators, is frequency deviation limits and required spinning reserve to diminish it. In this paper, as a case study, technical criteria in Power evacuation system of IPP12 power plant to Salalah grid (DPC, Oman) are discussed.
Keywords
power generation planning; power grids; power system interconnection; IPP12 power plant; Salalah grid; frequency deviation limits; generating units; grid disturbances; interconnection power plants; islanded grids; power evacuation system; spinning reserve; stringent requirements; system operators; system planners; technical rules; Circuit breakers; Integrated circuit interconnections; Propagation losses; Spinning; Steady-state; Turbines; Generating unit; Important Criterion; Interconnection Requirement; Technical Requirement for Interconnection; Unit Sizing;
fLanguage
English
Publisher
ieee
Conference_Titel
GCC Conference and Exhibition (GCCCE), 2015 IEEE 8th
Conference_Location
Muscat
Type
conf
DOI
10.1109/IEEEGCC.2015.7060080
Filename
7060080
Link To Document