• DocumentCode
    2020511
  • Title

    Calculating the Current Limits to Use in Production Line Dielectric Withstand Tests

  • Author

    Richardson, Shari

  • Author_Institution
    QuadTech, Inc., Maynard
  • fYear
    2007
  • fDate
    22-24 Oct. 2007
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This article includes the result of a survey as to what the term "breakdown" means, and provides a working definition of the term. Next, the article will investigate various methods for determining the impedance of a product to assist in setting the current limits.
  • Keywords
    current limiters; electric impedance; production testing; current limits; dielectric withstand tests; impedance; production line; Breakdown voltage; Dielectric breakdown; Dielectrics and electrical insulation; Electric breakdown; Leakage current; Performance evaluation; Production; Safety; Test equipment; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Product Compliance Engineering, 2007. PSES 2007. IEEE Symposium on
  • Conference_Location
    Longmont, CO
  • Print_ISBN
    978-1-4244-1072-9
  • Electronic_ISBN
    978-1-4244-1072-9
  • Type

    conf

  • DOI
    10.1109/PSES.2007.4378481
  • Filename
    4378481