DocumentCode
2022143
Title
Impact of massive synchrophasor deployment on reliability coordination and reporting
Author
Kincic, S. ; Wangen, B. ; Mittelstadt, W.A. ; Fenimore, M. ; Cassiadoro, M. ; VanZandt, V. ; Perez, L.
fYear
2012
fDate
22-26 July 2012
Firstpage
1
Lastpage
8
Abstract
Full implementation of WISP (Western Interconnection Synchrophasor Program) is scheduled for March 2013. New synchrophasor applications that allow better visibility of the interconnection will be deployed in WECC´s Reliability Coordination Centers in Vancouver, Wash., and Loveland, Colo. This paper provides a brief insight into the new applications and their functionality.
Keywords
phasor measurement; power system interconnection; power system reliability; Loveland Colo; Vancouver Wash; WECC Reliability Coordination Center; WISP; Western Electricity Coordinating Council; massive synchrophasor deployment; reliability coordination; western interconnection synchrophasor program; Damping; Monitoring; Oscillators; Phasor measurement units; Real-time systems; Reliability; Voltage measurement; PMU (Phasor Measurement Unit); RC (Reliability Coordinator); SCADA (Supervisory Control and Data Acquisition); U.S. DOE (United States Department of Energy); WECC (Western Electricity Coordinating Council); WISP (Western Interconnection Synchrophasor Program);
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting, 2012 IEEE
Conference_Location
San Diego, CA
ISSN
1944-9925
Print_ISBN
978-1-4673-2727-5
Electronic_ISBN
1944-9925
Type
conf
DOI
10.1109/PESGM.2012.6343929
Filename
6343929
Link To Document