    Full implementation of WISP (Western Interconnection Synchrophasor Program) is scheduled for March 2013. New synchrophasor applications that allow better visibility of the interconnection will be deployed in WECC´s Reliability Coordination Centers in Vancouver, Wash., and Loveland, Colo. This paper provides a brief insight into the new applications and their functionality.
  • Keywords
    phasor measurement; power system interconnection; power system reliability; Loveland Colo; Vancouver Wash; WECC Reliability Coordination Center; WISP; Western Electricity Coordinating Council; massive synchrophasor deployment; reliability coordination; western interconnection synchrophasor program; Damping; Monitoring; Oscillators; Phasor measurement units; Real-time systems; Reliability; Voltage measurement; PMU (Phasor Measurement Unit); RC (Reliability Coordinator); SCADA (Supervisory Control and Data Acquisition); U.S. DOE (United States Department of Energy); WECC (Western Electricity Coordinating Council); WISP (Western Interconnection Synchrophasor Program);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2012 IEEE
  • Conference_Location
    San Diego, CA
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4673-2727-5
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PESGM.2012.6343929
  • Filename
    6343929