DocumentCode :
2027120
Title :
Operation of the TFTR neutral beam injection system which achieved greater than 30 megawatt injection
Author :
Stevenson, T. ; von Halle, A. ; Dudek, L. ; Grisham, L. ; O´Connor, T. ; Williams, M.
Author_Institution :
Plasma Phys. Lab., Princeton Univ., NJ, USA
fYear :
1989
fDate :
2-6 Oct 1989
Firstpage :
292
Abstract :
The Tokamak Fusion Test Reactor (TFTR) neutral beam injection system (NBIS) has performed injection experiments on the TFTR since 1984. During the 1988 run period, the NBIS exceeded the design capability of 27 MW of neutral injection. How the NBIS was operated to yield 30.5 MW of injected neutrals, the equipment upgrades and operational improvements from the 1987 operating experience which contributed to achieving this result, and the techniques used to achieve substantially increased system reliability over the 1987 run period are discussed
Keywords :
fission reactor operation; fusion reactor ignition; fusion reactor theory and design; ion beams; plasma heating; 30.5 MW; TFTR; Tokamak Fusion Test Reactor; equipment upgrades; neutral beam injection system; neutral injection; operational improvements; Bellows; Flanges; Heating; Ion sources; Laboratories; Niobium; Particle beam injection; Physics; SCADA systems; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fusion Engineering, 1989. Proceedings., IEEE Thirteenth Symposium on
Conference_Location :
Knoxville, TN
Type :
conf
DOI :
10.1109/FUSION.1989.102226
Filename :
102226
Link To Document :
بازگشت