DocumentCode :
2031308
Title :
Practical considerations for implementing wide area monitoring, protection and control
Author :
Price, Elmo
Author_Institution :
ABB Inc., Dawsonville, GA, USA
fYear :
2006
fDate :
4-6 April 2006
Abstract :
The purpose of this paper to provide a brief overview of wide area monitoring, protection and control systems addressing the fundamental process of collecting and delivering the synchrophasor data to the application, a vision of the technology direction, and some practical points to consider when implementing a phasor measurement program. It is based on experience gained working with utilities in their initial efforts to implement phasor measurement projects.
Keywords :
power system control; power system dynamic stability; power system measurement; power system protection; power system state estimation; synchronisation; voltage measurement; wide area networks; phasor measurement program; power system control; power system dynamic stability; power system protection; state estimation; synchrophasor data; voltage measurement; wide area monitoring; Control systems; Delay; Frequency synchronization; Global Positioning System; Monitoring; Phasor measurement units; Power system control; Power system protection; Substation protection; Voltage measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Protective Relay Engineers, 2006. 59th Annual Conference for
Print_ISBN :
1-4244-0043-0
Type :
conf
DOI :
10.1109/CPRE.2006.1638690
Filename :
1638690
Link To Document :
بازگشت