DocumentCode
2037525
Title
An executable software project management model by beta-distributed stochastic Petri nets
Author
Chun-suk Park ; Gang-soo Lee ; Jung-mo Yoon
Author_Institution
Dept. of Comput. Sci., Han Nam Univ., Taejon, South Korea
Volume
1
fYear
1993
fDate
19-21 Oct. 1993
Firstpage
430
Abstract
This paper proposes a new software project time and cost management model using a beta-distributed stochastic Petri nets (BSPN), which is an integrated model of PERT and Petri nets. A beta-distributed transition, from PERT, is adapted for modeling the uncertainty of time and cost of a software project. Structural properties of the project are analyzed from structure of the BSPN. Behavioral characteristics of the project, such as time and cost, are analyzed using a chronological reachability graph of BSPN.<>
Keywords
DP management; PERT; Petri nets; project management; software cost estimation; software engineering; stochastic processes; PERT; beta-distributed stochastic Petri nets; chronological reachability graph; cost management; executable software project management model; time management model; uncertainty; Bars; Computer science; Concurrent computing; Costs; Delay effects; Petri nets; Project management; Random variables; Stochastic processes; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
TENCON '93. Proceedings. Computer, Communication, Control and Power Engineering.1993 IEEE Region 10 Conference on
Conference_Location
Beijing, China
Print_ISBN
0-7803-1233-3
Type
conf
DOI
10.1109/TENCON.1993.320019
Filename
320019
Link To Document