Title
Installation and inactive commissioning of the JET active gas handling system (AGHS)
Author
Hemmerich, J.L. ; Bell, A.C. ; Boucquey, P. ; Caldwell-Nichols, C. ; Chuilon, P. ; Delvart, F. ; Grieveson, B. ; Haange, R. ; Jones, G. ; Lässer, R. ; Laveyry, M. ; Lupo, J. ; Mart, J. ; Milverton, P. ; Salanave, J.-L. ; Serio, L. ; Skinner, N. ; Stagg, R
Author_Institution
JET Joint Undertaking, Abingdon, UK
fYear
1993
fDate
11-15 Oct 1993
Firstpage
37
Lastpage
41
Abstract
The installation of all AGHS subsystems in compliance with a strict Quality Assurance Programme was completed in 1993. Installation was followed by end-to-end commissioning of signal and control loop connections to the Distributed Control System. Plant layout and function are described and results of process tests with hydrogen, deuterium and other test gases are presented. These tests have revealed some minor deficiencies on the subsystems for Cryogenic Distillation, Exhaust Detritiation and Impurity Processing which have been or are in the process of being resolved prior to commissioning with tritium, initially 3g of T2, due to start in 1994
Keywords
distributed control; Cryogenic Distillation; Distributed Control System; Exhaust Detritiation; Impurity Processing; JET active gas handling system; control loop connections; end-to-end commissioning; inactive commissioning; Calorimetry; Control systems; Cryogenics; Gases; Humidity measurement; Hydrogen; Impurities; Isotopes; Quality assurance; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Fusion Engineering - Supplement, 1993., 15th IEEE/NPSS Symposium on
Conference_Location
Hyannis, MA
Type
conf
DOI
10.1109/SFE.1993.472789
Filename
472789
Link To Document