    Installation and inactive commissioning of the JET active gas handling system (AGHS)

  • Author

    Hemmerich, J.L. ; Bell, A.C. ; Boucquey, P. ; Caldwell-Nichols, C. ; Chuilon, P. ; Delvart, F. ; Grieveson, B. ; Haange, R. ; Jones, G. ; Lässer, R. ; Laveyry, M. ; Lupo, J. ; Mart, J. ; Milverton, P. ; Salanave, J.-L. ; Serio, L. ; Skinner, N. ; Stagg, R

  • Author_Institution
    JET Joint Undertaking, Abingdon, UK
  • fYear
    1993
  • fDate
    11-15 Oct 1993
  • Firstpage
    37
  • Lastpage
    41
  • Abstract
    The installation of all AGHS subsystems in compliance with a strict Quality Assurance Programme was completed in 1993. Installation was followed by end-to-end commissioning of signal and control loop connections to the Distributed Control System. Plant layout and function are described and results of process tests with hydrogen, deuterium and other test gases are presented. These tests have revealed some minor deficiencies on the subsystems for Cryogenic Distillation, Exhaust Detritiation and Impurity Processing which have been or are in the process of being resolved prior to commissioning with tritium, initially 3g of T2, due to start in 1994
  • Keywords
    distributed control; Cryogenic Distillation; Distributed Control System; Exhaust Detritiation; Impurity Processing; JET active gas handling system; control loop connections; end-to-end commissioning; inactive commissioning; Calorimetry; Control systems; Cryogenics; Gases; Humidity measurement; Hydrogen; Impurities; Isotopes; Quality assurance; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fusion Engineering - Supplement, 1993., 15th IEEE/NPSS Symposium on
  • Conference_Location
    Hyannis, MA
  • Type

    conf

  • DOI
    10.1109/SFE.1993.472789
  • Filename
    472789