DocumentCode
2042200
Title
Using HGA to solve E/T scheduling problems with fuzzy processing time and fuzzy due date
Author
Geng, Zhao-qiang ; Zou, Yi-ren
Author_Institution
Inst. of Autom., Acad. Sinica, Beijing, China
Volume
2
fYear
2001
fDate
2001
Firstpage
1161
Abstract
This paper considers fuzzy single machine and flow shop earliness/tardiness scheduling problems with fuzzy processing time and fuzzy due date. Fuzzy processing time is denoted by a triangular fuzzy number and fuzzy due date is denoted by a trapezoid fuzzy number. We formulate two kinds of scheduling model of single machine and flow shop scheduling problems. When solving the first kind of model with exact processing time and fuzzy due date, we take minimum earliness/tardiness penalty as optimized object and use hybrid genetic algorithm to search the optimal scheduling sequence. As for single machine model, we still adopt heuristic rule to get optimum common due date. When solving the second kind of model with both fuzzy processing time and fuzzy due date, the maximum average agreement index according to fuzzy completion time and fuzzy due date is considered as optimized object. Some numerical examples are given to illustrate the effectiveness and feasibility of our proposed algorithm
Keywords
fuzzy logic; genetic algorithms; E/T scheduling problems; flow shop earliness/tardiness scheduling; fuzzy due date; fuzzy processing time; fuzzy single machine; heuristic rule; hybrid genetic algorithm; maximum average agreement index; Artificial intelligence; Automation; Computer integrated manufacturing; Genetic algorithms; Job shop scheduling; Mathematical model; Mathematics; Optimal scheduling; Processor scheduling; Single machine scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man, and Cybernetics, 2001 IEEE International Conference on
Conference_Location
Tucson, AZ
ISSN
1062-922X
Print_ISBN
0-7803-7087-2
Type
conf
DOI
10.1109/ICSMC.2001.973076
Filename
973076
Link To Document