DocumentCode :
2042852
Title :
A combined process/resource model for shop floor simulation
Author :
Jang, Pyoung Yol ; Jones, Albert ; Park, Sungsik ; Cho, Hyunbo
Author_Institution :
Div. of Mech. & Ind. Eng., Pohang Univ. of Sci. & Technol., South Korea
Volume :
2
fYear :
2001
fDate :
2001
Firstpage :
1310
Abstract :
The paper describes process and resource modeling capabilities of PRISM (process and resource model-based intelligent simulator). The former allows users to model nonlinear process plans that contain all possible routings through the processes in the shop, decision-making rules associated with those routings, and precedence relationships among the processes in those routings. The latter allows users to define all of the properties of shop floor resources and decision rules associated with those resources
Keywords :
computer aided production planning; digital simulation; knowledge based systems; resource allocation; PRISM; combined process/resource model; decision rules; decision-making rules; nonlinear process plans; precedence relationships; process and resource model based intelligent simulator; process modeling; resource modeling capabilities; shop floor resources; shop floor simulation; Control systems; Drilling; Industrial engineering; Job shop scheduling; Magnetic heads; Manufacturing processes; Milling; NIST; Routing; Turning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man, and Cybernetics, 2001 IEEE International Conference on
Conference_Location :
Tucson, AZ
ISSN :
1062-922X
Print_ISBN :
0-7803-7087-2
Type :
conf
DOI :
10.1109/ICSMC.2001.973102
Filename :
973102
Link To Document :
بازگشت