DocumentCode
2046333
Title
Automatic generation control for Gezhouba Erjiang Hydropower Plant
Author
Wang Dingyi ; Wu Yonggang
Author_Institution
Dept. of Electr. Eng., Huazhong Univ. of Sci. & Technol., Wuhan, China
Volume
5
fYear
1993
fDate
19-21 Oct. 1993
Firstpage
59
Abstract
The authors present a new approach to solving the automatic generation control (AGC) problem stage by stage, using in each stage different methods, namely dynamic programming, known as "priority indices of generating unit start/stop" and the principle of equal incremental of water flow, which was implemented at Gezhouba Erjiang Hydropower Plant. Since June 1989 the AGC program has operated continuously and successfully. Plant operation security was significantly improved. The plant automation level was raised. Considerable economical benefits were obtained. In comparison with other methods, this approach has many important advantages. The proposed approach is suitable for use in various hydropower plants.<>
Keywords
dynamic programming; economics; hydroelectric power stations; power station computer control; Gezhouba Erjiang Hydropower Plant; automatic generation control; computer control; dynamic programming; economical benefits; hydraulic turbine; load dispatching; on-line control; operation security; optimisation; Automatic control; Automatic generation control; Automation; Dispatching; Dynamic programming; Hydraulic turbines; Hydroelectric power generation; Power generation; Power generation economics; Rivers;
fLanguage
English
Publisher
ieee
Conference_Titel
TENCON '93. Proceedings. Computer, Communication, Control and Power Engineering.1993 IEEE Region 10 Conference on
Conference_Location
Beijing, China
Print_ISBN
0-7803-1233-3
Type
conf
DOI
10.1109/TENCON.1993.320585
Filename
320585
Link To Document