• DocumentCode
    2048300
  • Title

    The Scene Improvement of Jiefang Truck´s Engine Packing Line

  • Author

    Ma Yanhua ; Zheng Wu ; Zheng Yubin ; Ding Ye ; Yun Fei ; Jiang Ying

  • Author_Institution
    Inst. of Mech. Sci. & Eng., Jilin Univ., Changchun, China
  • Volume
    3
  • fYear
    2010
  • fDate
    14-15 Aug. 2010
  • Firstpage
    161
  • Lastpage
    165
  • Abstract
    The scene improvement of productive process is an indispensable aspect for an enterprise. It is the foundation and guarantee of the enterprise´s operation and management´s success. In this paper, based on the analysis of Jiefang Truck engine production packaging lines, the logistics of the production line, flat layout, handling, balance and work place have been improved. So wastes can be eliminated and production efficiency can be increased.
  • Keywords
    automotive engineering; engines; facilities layout; logistics; packaging machines; productivity; Jiefang truck engine production packaging line; balance analysis; engine packing line; enterprise management; enterprise operation; flat layout; logistics; production efficiency; production handling; productive process; scene improvement; work place; Assembly; Electron tubes; Engines; Layout; Materials; Packaging; Production; Balance Analysis; Engine Packing Line; Layout; Production Efficiency; Scene Improvement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Engineering (ICIE), 2010 WASE International Conference on
  • Conference_Location
    Beidaihe, Hebei
  • Print_ISBN
    978-1-4244-7506-3
  • Electronic_ISBN
    978-1-4244-7507-0
  • Type

    conf

  • DOI
    10.1109/ICIE.2010.216
  • Filename
    5570822