DocumentCode
2050965
Title
The effect of short-term planning delays in multi-item production-inventory systems
Author
Tokola, Henri ; Niemi, Esko
Author_Institution
Sch. of Eng., Dept. of Eng. Design & Production, Aalto Univ., Espoo, Finland
fYear
2011
fDate
25-27 May 2011
Firstpage
1
Lastpage
5
Abstract
This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.
Keywords
assembling; inventory management; machining; production planning; assembly factory; batching delays; electrical machine company; machining subcontractor; multi-item production-inventory systems; short-term planning delays; short-term production planning; Assembly; Companies; Delay; Machining; Planning; Production facilities; delays; multi-item production; production planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Assembly and Manufacturing (ISAM), 2011 IEEE International Symposium on
Conference_Location
Tampere
ISSN
Pending
Print_ISBN
978-1-61284-342-1
Electronic_ISBN
Pending
Type
conf
DOI
10.1109/ISAM.2011.5942310
Filename
5942310
Link To Document