• DocumentCode
    2050965
  • Title

    The effect of short-term planning delays in multi-item production-inventory systems

  • Author

    Tokola, Henri ; Niemi, Esko

  • Author_Institution
    Sch. of Eng., Dept. of Eng. Design & Production, Aalto Univ., Espoo, Finland
  • fYear
    2011
  • fDate
    25-27 May 2011
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper studies short-term production planning in multi-item production-inventory systems. In short-term planning we study the delays caused by frozen schedules and planning intervals. We consider three different systems that are here called the machining subcontractor, the electrical machine company, and the assembly factory. Each of these has its own special characteristics. The subcontractor has several batching delays caused by setups, the electrical machine company ships products periodically, and the assembly factory has long production times and a long shipment time for finished products. We study how these characteristics affect their short-term production planning. Simulation results show how the electrical machine company has the most noticeable advantage from planning that does not have any delays.
  • Keywords
    assembling; inventory management; machining; production planning; assembly factory; batching delays; electrical machine company; machining subcontractor; multi-item production-inventory systems; short-term planning delays; short-term production planning; Assembly; Companies; Delay; Machining; Planning; Production facilities; delays; multi-item production; production planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Assembly and Manufacturing (ISAM), 2011 IEEE International Symposium on
  • Conference_Location
    Tampere
  • ISSN
    Pending
  • Print_ISBN
    978-1-61284-342-1
  • Electronic_ISBN
    Pending
  • Type

    conf

  • DOI
    10.1109/ISAM.2011.5942310
  • Filename
    5942310