Title :
Abstract for ‘planning the SRP transmission system with dynamic compliance influences’
Abstract :
SRP is an electric and water utility serving a 2900 square mile service area in the Phoenix metro area and Pinal County in Arizona. SRP is dedicated to serving customers with a reliable and cost effective delivery system. SRP builds transmission to serve load growth, reliability needs of the network, to increase load serving capability and for deliverability of resources.
Keywords :
electricity supply industry; power transmission planning; Arizona; Phoenix metro area; Pinal County; SRP transmission system planning; dynamic compliance influences; electric utility; load serving capability; reliability; resource deliverability; water utility; Abstracts; Buildings; Conferences; Economics; Maintenance engineering; Planning; Reliability;
Conference_Titel :
Power and Energy Society General Meeting, 2012 IEEE
Conference_Location :
San Diego, CA
Print_ISBN :
978-1-4673-2727-5
Electronic_ISBN :
1944-9925
DOI :
10.1109/PESGM.2012.6345114