• DocumentCode
    2056375
  • Title

    Unit Commitment and Dispatch Strategies for a Wind Park

  • Author

    Moyano, C.F. ; Lopes, J. A Peças

  • Author_Institution
    Instituto de Engenharia de Sistemas e Computadores do Porto, 4200-465 Porto, Portugal. cmoyano@inescporto.pt
  • fYear
    2007
  • fDate
    12-14 April 2007
  • Firstpage
    12
  • Lastpage
    17
  • Abstract
    This paper presents an optimization strategy to be adopted at wind park control level. This approach transposes the classical formulations of a unit commitment and a generator dispatch problem to the turbines of a wind park, assuming that variable speed wind turbines are installed, and considering that wind speed forecasts are available. Wind speed forecasts, demands from grid operators or generation levels defined to comply with market strategies are the inputs of the problem. A small example is used to illustrate the proposed approach.
  • Keywords
    Centralized control; Control systems; Induction generators; Mesh generation; Power generation; Wind energy generation; Wind forecasting; Wind power generation; Wind speed; Wind turbines;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering, Energy and Electrical Drives, 2007. POWERENG 2007. International Conference on
  • Conference_Location
    Setubal, Portugal
  • Print_ISBN
    978-1-4244-0895-5
  • Electronic_ISBN
    978-1-4244-0895-5
  • Type

    conf

  • DOI
    10.1109/POWERENG.2007.4380134
  • Filename
    4380134