DocumentCode
2060616
Title
Optimal scheduling of transient cycles for single-armed cluster tools
Author
Dae-Kyu Kim ; Tae-Eog Lee ; Hyun-Jung Kim
Author_Institution
Dept. of Ind. & Syst. Eng., KAIST (Korea Adv. Inst. of Sci. & Technol.), Daejeon, South Korea
fYear
2013
fDate
17-20 Aug. 2013
Firstpage
874
Lastpage
879
Abstract
Cluster tools, widely used for wafer fabrication processes, have complex scheduling problems because a tool consists of several single-wafer processing chambers and a robot, and has a number of scheduling constraints. Most scheduling studies on cluster tools have focused on steady cyclic cycles where identical work cycles are repeated. However, as the lot size tends to be smaller, a tool has longer noncyclic operation cycles such as the start-up and the close-down. Therefore, we examine a way of scheduling for noncyclic cycles of single-armed cluster tools so as to minimize the makespan. To do this, we first analyse fundamental properties of tool behaviours including noncyclic transient cycles. Using the properties, we identify the workload of processing a lot with a number of wafers. Then, we develop the condition for which the conventional backward sequence, which is known to be optimal for cyclic work cycles, has the optimal makespan. Finally, we develop a linear programming model to find the minimum makespan of the backward sequence.
Keywords
cluster tools; linear programming; scheduling; semiconductor technology; transients; backward sequence; linear programming model; noncyclic transient cycles; optimal makespan; optimal scheduling; single-armed cluster tools; wafer fabrication; Job shop scheduling; Loading; Optimal scheduling; Robots; Schedules; System recovery; Transient analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering (CASE), 2013 IEEE International Conference on
Conference_Location
Madison, WI
ISSN
2161-8070
Type
conf
DOI
10.1109/CoASE.2013.6653939
Filename
6653939
Link To Document