• DocumentCode
    2061444
  • Title

    A heuristic algorithm for minimizing total absolute deviation from distinct due dates on a single machine

  • Author

    You Li ; Zhibin Jiang ; Wenyou Jia

  • Author_Institution
    Dept. of Ind. Eng. & Manage., Shanghai Jiao Tong Univ. (SJTU), Shanghai, China
  • fYear
    2013
  • fDate
    17-20 Aug. 2013
  • Firstpage
    392
  • Lastpage
    397
  • Abstract
    In this paper, we present a heuristic algorithm for minimizing total absolute deviation from distinct due dates on a single machine. First, several dominance properties related are established using proof by adjacent pairwise interchanges. Then, a detailed procedure of the proposed algorithm is given. The proposed algorithm is tested on a set of randomly generated problem instances. Results of numerical experiments show that the heuristic algorithm is computationally efficient, and it can obtain a good enough solution within an acceptable time.
  • Keywords
    single machine scheduling; adjacent pairwise interchange; distinct due dates; dominance properties; heuristic algorithm; single machine; total absolute deviation minimization; Algorithm design and analysis; Clustering algorithms; Computational efficiency; Educational institutions; Heuristic algorithms; Linear programming; Schedules; adjacent pairwise interchanges; distinct due dates; earliness; tardiness;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering (CASE), 2013 IEEE International Conference on
  • Conference_Location
    Madison, WI
  • ISSN
    2161-8070
  • Type

    conf

  • DOI
    10.1109/CoASE.2013.6653966
  • Filename
    6653966