Abstract
The optimal placement and power level of the different types of generation units is a non-convex optimization problem. The technology modeling of renewable energy distribute generation of wind and photovoltaic were introduced, and a heuristic method for the optimal placement and monitoring of renewable energy distributed generators at the sub-transmission and distribution levels of the electric power network was proposed in the paper. A test system with DGs is used to prove the validity of the proposed method.
Keywords
concave programming; distributed power generation; photovoltaic power systems; wind power plants; distribution level; electric power network; heuristic method; nonconvex optimization problem; photovoltaic power system; renewable energy DG monitoring; renewable energy distributed generator optimal placement; subtransmission level; wind power system; distributed generation; power system; renewable energy; smart grid;
fLanguage
English
Publisher
ieee
Conference_Titel
Electricity Distribution (CICED), 2012 China International Conference on
Conference_Location
Shanghai
ISSN
2161-7481
Print_ISBN
978-1-4673-6065-4
Electronic_ISBN
2161-7481
Type
conf
DOI
10.1109/CICED.2012.6508624
Filename
6508624
Link To Document