• DocumentCode
    2063319
  • Title

    The optimization study of asset retirement and reuse management in electric power enterprises

  • Author

    Yonghuan Hu ; Fengna Dong ; Xin Wang

  • Author_Institution
    Shanghai Municipal Electr. Power Co., Shanghai, China
  • fYear
    2012
  • fDate
    10-14 Sept. 2012
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Power supply enterprises often face the problem of large backlog of retired assets because of low attention on retired assets reusing. Taking Shanghai Electric Power Company as an example, this study gives some references to electric power enterprises in retired assets management. Starting from the management and reusing of retired assets, the paper mainly discussed its optimization and the corresponding mechanisms including the operating and security mechanism and information system, which could contribute largely to enhancing retired assets management, raising reuse rate and saving project cost.
  • Keywords
    asset management; electricity supply industry; information systems; life cycle costing; optimisation; power system management; Shanghai Electric Power Company; asset retirement; electric power enterprises; information system; life cycle management; optimization; power supply enterprises; project cost saving; retired asset reuse; reuse management; reuse rate; security mechanism; life cycle management; operating process; retired assets; reusing optimization; safeguard mechanism;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electricity Distribution (CICED), 2012 China International Conference on
  • Conference_Location
    Shanghai
  • ISSN
    2161-7481
  • Print_ISBN
    978-1-4673-6065-4
  • Electronic_ISBN
    2161-7481
  • Type

    conf

  • DOI
    10.1109/CICED.2012.6508693
  • Filename
    6508693