DocumentCode
2063319
Title
The optimization study of asset retirement and reuse management in electric power enterprises
Author
Yonghuan Hu ; Fengna Dong ; Xin Wang
Author_Institution
Shanghai Municipal Electr. Power Co., Shanghai, China
fYear
2012
fDate
10-14 Sept. 2012
Firstpage
1
Lastpage
5
Abstract
Power supply enterprises often face the problem of large backlog of retired assets because of low attention on retired assets reusing. Taking Shanghai Electric Power Company as an example, this study gives some references to electric power enterprises in retired assets management. Starting from the management and reusing of retired assets, the paper mainly discussed its optimization and the corresponding mechanisms including the operating and security mechanism and information system, which could contribute largely to enhancing retired assets management, raising reuse rate and saving project cost.
Keywords
asset management; electricity supply industry; information systems; life cycle costing; optimisation; power system management; Shanghai Electric Power Company; asset retirement; electric power enterprises; information system; life cycle management; optimization; power supply enterprises; project cost saving; retired asset reuse; reuse management; reuse rate; security mechanism; life cycle management; operating process; retired assets; reusing optimization; safeguard mechanism;
fLanguage
English
Publisher
ieee
Conference_Titel
Electricity Distribution (CICED), 2012 China International Conference on
Conference_Location
Shanghai
ISSN
2161-7481
Print_ISBN
978-1-4673-6065-4
Electronic_ISBN
2161-7481
Type
conf
DOI
10.1109/CICED.2012.6508693
Filename
6508693
Link To Document