• DocumentCode
    2064146
  • Title

    Managing the Mars Science Laboratory Thermal Vacuum Test for safety and success

  • Author

    Evans, Jordan P.

  • Author_Institution
    Jet Propulsion Lab., California Inst. of Technol., Pasadena, CA, USA
  • fYear
    2010
  • fDate
    6-13 March 2010
  • Firstpage
    1
  • Lastpage
    9
  • Abstract
    The Mars Science Laboratory is a NASA/JPL mission to send the next generation of rover to Mars. Originally slated for launch in 2009, development problems led to a delay in the project until the next launch opportunity in 2011. Amidst the delay process, the Launch/Cruise Solar Thermal Vacuum Test was undertaken as risk reduction for the project. With varying maturity and capabilities of the flight and ground systems, undertaking the test in a safe manner presented many challenges. This paper describes the technical and management challenges and the actions undertaken that led to the ultimate safe and successful execution of the test.
  • Keywords
    aerospace testing; planetary rovers; risk management; vacuum techniques; Mars Science Laboratory; NASA/JPL mission; cruise solar thermal vacuum test; launch solar thermal vacuum test; risk reduction; Costs; Humans; Laboratories; Mars; Safety; Space technology; Supply chain management; Supply chains; Testing; Thermal management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Aerospace Conference, 2010 IEEE
  • Conference_Location
    Big Sky, MT
  • ISSN
    1095-323X
  • Print_ISBN
    978-1-4244-3887-7
  • Electronic_ISBN
    1095-323X
  • Type

    conf

  • DOI
    10.1109/AERO.2010.5446861
  • Filename
    5446861