DocumentCode
2066339
Title
Container flow schedule in a container seaport
Author
Song, Liying ; Cherrett, Tom
Author_Institution
Sch. of Traffic & Transp., Beijing Jiaotong Univ., Beijing, China
fYear
2011
fDate
16-18 Dec. 2011
Firstpage
80
Lastpage
83
Abstract
It is very important to schedule container flows in a container seaport. Current paper aims to discuss the schedule issue of cranes to the handle containers, with an objective of optimizing crane scheduling and container flows in the yard subject to deterministic crane availability constraints. The problem is formulated as NP-hard problem and a revised genetic algorithm is proposed to solve it.
Keywords
containers; cranes; genetic algorithms; scheduling; sea ports; NP-hard problem; container flow schedule; container seaport; crane scheduling; deterministic crane availability constraint; genetic algorithm; Biological cells; Containers; Cranes; Genetic algorithms; Mathematical model; Schedules; Transportation; container; genetic algorithm; optimization; port;
fLanguage
English
Publisher
ieee
Conference_Titel
Transportation, Mechanical, and Electrical Engineering (TMEE), 2011 International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-4577-1700-0
Type
conf
DOI
10.1109/TMEE.2011.6199152
Filename
6199152
Link To Document