• DocumentCode
    2066339
  • Title

    Container flow schedule in a container seaport

  • Author

    Song, Liying ; Cherrett, Tom

  • Author_Institution
    Sch. of Traffic & Transp., Beijing Jiaotong Univ., Beijing, China
  • fYear
    2011
  • fDate
    16-18 Dec. 2011
  • Firstpage
    80
  • Lastpage
    83
  • Abstract
    It is very important to schedule container flows in a container seaport. Current paper aims to discuss the schedule issue of cranes to the handle containers, with an objective of optimizing crane scheduling and container flows in the yard subject to deterministic crane availability constraints. The problem is formulated as NP-hard problem and a revised genetic algorithm is proposed to solve it.
  • Keywords
    containers; cranes; genetic algorithms; scheduling; sea ports; NP-hard problem; container flow schedule; container seaport; crane scheduling; deterministic crane availability constraint; genetic algorithm; Biological cells; Containers; Cranes; Genetic algorithms; Mathematical model; Schedules; Transportation; container; genetic algorithm; optimization; port;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transportation, Mechanical, and Electrical Engineering (TMEE), 2011 International Conference on
  • Conference_Location
    Changchun
  • Print_ISBN
    978-1-4577-1700-0
  • Type

    conf

  • DOI
    10.1109/TMEE.2011.6199152
  • Filename
    6199152