• DocumentCode
    20679
  • Title

    Multistage expansion planning for distribution networks including unit commitment

  • Author

    El-Zonkoly, A.M.

  • Author_Institution
    Dept. of Electr. & Control Eng., Arab Acad. for Sci. & Technol., Alexandria, Egypt
  • Volume
    7
  • Issue
    7
  • fYear
    2013
  • fDate
    Jul-13
  • Firstpage
    766
  • Lastpage
    778
  • Abstract
    In this study, a multistage expansion and unit commitment (UC) planning for distribution networks using artificial bee colony (ABC) is presented. A dynamic model for expansion considers installation of new distributed generation units, expansion of pre-installed generating units´ capacities, rewiring and addition of new load points. The expansion plane is carried out in three stages. In each stage, an hourly-day-ahead UC schedule is determined over the course of the stage period. The proposed algorithm uses the ABC to obtain a feasible commitment schedule for the generating units installed. An economical dispatch of these units along with load shedding is then carried out in each stage period to satisfy the system´s equality and inequality constraints. The proposed algorithm is applied to different test systems to verify its efficiency.
  • Keywords
    distributed power generation; dynamic programming; load shedding; power distribution planning; power generation dispatch; power generation scheduling; ABC; artificial bee colony; distributed generation units; distribution networks; economical dispatch; feasible commitment schedule; hourly-day-ahead UC schedule; load points; load shedding; multistage expansion planning; preinstalled generating unit capacities; stage period; unit commitment;
  • fLanguage
    English
  • Journal_Title
    Generation, Transmission & Distribution, IET
  • Publisher
    iet
  • ISSN
    1751-8687
  • Type

    jour

  • DOI
    10.1049/iet-gtd.2012.0289
  • Filename
    6552531