DocumentCode :
2070319
Title :
Implementation and operational benefits of integrated digital generator protection
Author :
Price, R.T.
fYear :
1995
fDate :
34788
Firstpage :
42522
Lastpage :
42524
Abstract :
The application of modern, integrated generator protection can help reduce the design and construction lead times for new generating plant, as well as the time required for routine periodic testing. A digital protection package offers additional functionality, in terms of instrumentation, data acquisition and data recording. The return on investment in a modern protection system can be increased
Keywords :
data acquisition; data recording; digital instrumentation; electric generators; machine protection; machine testing; power engineering computing; data acquisition; data recording; instrumentation; integrated digital generator protection; investment return; operational benefits; protection system; routine periodic testing;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Combined Cycle/Cogeneration Systems, IEE Colloquium on
Conference_Location :
London
Type :
conf
DOI :
10.1049/ic:19950420
Filename :
473048
Link To Document :
بازگشت