• DocumentCode
    2072239
  • Title

    Scheduling and planning problem in manufacturing systems with multiobjective genetic algorithm

  • Author

    Li, Y. ; Man, K.F.

  • Author_Institution
    Dept. of Electron. Eng., City Univ. of Hong Kong, Kowloon, Hong Kong
  • Volume
    1
  • fYear
    1998
  • fDate
    31 Aug-4 Sep 1998
  • Firstpage
    274
  • Abstract
    In this paper an extensive earliness/tardiness production scheduling and planning (ETPSP) model with lot-size consideration and capacity balance is proposed. An innovative approach using a multiobjective genetic algorithm (MOGA) is designed as its solutions. The presented MOGA approach can even deal with ETPSP problem which consists of highly complicated and nonlinear functions for the measure performance. The effectiveness of this approach is demonstrated by simulation results as well as the comparisons with other techniques
  • Keywords
    genetic algorithms; manufacturing industries; manufacturing resources planning; nonlinear functions; production control; scheduling; MRP-II; capacity balance; extensive earliness/tardiness production scheduling; just-in-time; lot-size consideration; manufacturing resource planning; manufacturing systems planning; manufacturing systems scheduling; multiobjective genetic algorithm; multiobjective optimisation; nonlinear functions; simulation; Algorithm design and analysis; Capacity planning; Electronic mail; Genetic algorithms; Inventory management; Job shop scheduling; Large-scale systems; Manufacturing systems; Materials requirements planning; Production planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Electronics Society, 1998. IECON '98. Proceedings of the 24th Annual Conference of the IEEE
  • Conference_Location
    Aachen
  • Print_ISBN
    0-7803-4503-7
  • Type

    conf

  • DOI
    10.1109/IECON.1998.724135
  • Filename
    724135