A smooth transition from work breakdown structure to program plan: a minimum cost and risk model for Turkish Space Program
Author
Cakmak, Murat Arda ; Yuksel, Sadik Murat ; Gokpinar, Eyup Serdar
Author_Institution
Defense Industries Res. & Dev. Inst., TUBITAK, Ankara, Turkey
fYear
2005
fDate
9-11 June 2005
Firstpage
817
Lastpage
822
Abstract
In this paper, for an influent program plan, a process beginning from work breakdown structure (WBS) to get a minimum cost and risk model will be exhibited. As a good example of this process, a sample part of the Turkish Space Program (TSP) will be discussed. After the definitions of the terms that are used in the model will be given, the model definition will be presented with the evaluation methods descriptions. Finally, the technology challenge capacity will be outlined for Turkey. The process will also be suggested for future progress in the model given. This model can only be the beginning of the TSP as a small scale example.
Keywords
aerospace industry; space research; Turkey; Turkish Space Program; minimum cost and risk model; minimum cost model; minimum risk model; program plan; work breakdown structure; Contracts; Costs; Decision making; Defense industry; Electric breakdown; Finance; Hardware; Project management; Research and development; Systems engineering and theory;
fLanguage
English
Publisher
ieee
Conference_Titel
Recent Advances in Space Technologies, 2005. RAST 2005. Proceedings of 2nd International Conference on
Print_ISBN
0-7803-8977-8
Type
conf
DOI
10.1109/RAST.2005.1512692
Filename
1512692
Link To Document