DocumentCode
2078104
Title
Market based ancillary services for ramping
Author
Bakken, BjornH ; Petterteig, Astrid ; Nystad, Arne K.
Author_Institution
SINTEF Energy Res., Trondheim, Norway
Volume
3
fYear
2000
fDate
23-27 Jan 2000
Firstpage
1631
Abstract
In a few years, the Norwegian power system will experience substantially increased strain due to operation of four HVDC connections to Continental Europe. As a first step to meet the new challenges, the Norwegian system operator will introduce two new market-based ancillary services called `ramping´ and `extraordinary fast reserve´. When all four connections are in operation, introduction of a special AGC scheme where selected units follow the HVDC connections is considered. This paper presents the two new ancillary services, how they will be used to ensure generation capacity to follow fast load changes on the HVDC connections, and further how they can be extended to an AGC scheme while retaining the decentralised market structure. Examples of current system operation are also shown
Keywords
HVDC power transmission; electricity supply industry; power transmission control; power transmission economics; HVDC connections; Norway; ancillary services; decentralised market structure; extraordinary fast reserve; fast load changes; generation capacity; market-based ancillary services; power system; ramping; Automatic control; Control systems; Frequency; HVDC transmission; Power generation; Power markets; Power system control; Power system planning; Power systems; Production systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society Winter Meeting, 2000. IEEE
Print_ISBN
0-7803-5935-6
Type
conf
DOI
10.1109/PESW.2000.847589
Filename
847589
Link To Document