DocumentCode
2080196
Title
Capacitive current switching duties of high-voltage circuit breakers: background and practice of new IEC requirements
Author
Smeets, R.P.P. ; Lathouwers, A.G.A.
Author_Institution
KEME High-Power Lab., Arhnhem, Netherlands
Volume
3
fYear
2000
fDate
23-27 Jan 2000
Firstpage
2123
Abstract
Capacitive current is switched in power networks in a number of situations, such as the charging current of overhead lines, cables, GIS installations of the load currents of capacitor- and filter banks. In each of these situations, the current to be interrupted is small or very small. Nevertheless this interruption duty has to be considered with the utmost care. Above all, this is due to the inherent risk of re-establishment of arcing (`restrike´) because of severe voltage stress after interruption. Restrike may cause high over voltages depending on the network topology and can lead to damage to circuit components. This concern is reflected in a major revision of the relevant IEC standard (IEC60056) that is presently under consideration. In the revised edition, the concept of a `restrike-free´ circuit breaker is abandoned and the regime of testing is sharpened
Keywords
IEC standards; SF6 insulation; circuit breakers; fault currents; interrupters; switchgear testing; switching; IEC requirements; IEC standard; SF6; arcing re-establishment; capacitive current switching duties; circuit component damage; current interruption; high-voltage circuit breakers; interruption duty; power networks; restrike; severe voltage stress; testing regime; Cables; Circuit breakers; Circuit testing; Filter bank; Geographic Information Systems; IEC standards; Network topology; Stress; Switching circuits; Voltage control;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society Winter Meeting, 2000. IEEE
Print_ISBN
0-7803-5935-6
Type
conf
DOI
10.1109/PESW.2000.847681
Filename
847681
Link To Document