• DocumentCode
    2083304
  • Title

    Cost effective sludge management through processing capability improvement of a sludge drying plant

  • Author

    Mohamed, M.Z. ; Ghazali, M.F.M. ; Mokhtar, Z. ; Idrus, S.M. ; Wahab, N.A.

  • Author_Institution
    Engineering Department, PETRONAS Penapisan Melaka Sdn Bhd, Melaka, Malaysia
  • fYear
    2015
  • fDate
    May 31 2015-June 3 2015
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Bio-sludge cakes are products of a Sludge Drying Plant (SDP). It is considered as the final processing facility of Effluent Treatment System (ETS) before it is sent out for final disposal. Process disturbances can contribute to the amount of dry solid produced. The resultant of the dry solid produced can tremendously affect the overall process costs. Suitable sludge management can indeed reduce the overall process costs through improvement of the processing capability of the plant. This paper focuses on how cost and sludge management correlates in which improvement on the process capability can affect the cost of the plant. Parameter optimization for the SDP through identification on the current performance through actual process data analysis and identification of the subsystems are factors that contribute to the overall performance. On disposal, Kualiti Alam, a body appointed for disposal purposes, will charge the dried cake sludge based on the weight, however, not on the content. Therefore it is only sensible to export the dried cake at maximum dryness.
  • Keywords
    Artificial neural networks; Data collection; Optimization; Process control; Sensors; Solids; Visualization; Sludge Drying Plant; effluent treatment system; parameter optimization; process design; sludge management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Conference (ASCC), 2015 10th Asian
  • Conference_Location
    Kota Kinabalu, Malaysia
  • Type

    conf

  • DOI
    10.1109/ASCC.2015.7244451
  • Filename
    7244451